Agricultural Idaho United Electric Cooperative/ Southwest Irrigation District Aquifer Recharge Project
BPA recently signed a one-season demonstration agreement with United Electric Cooperative to evaluate the ability of the Southwest Irrigation District system to increase pumping during light load hours. The project kicked-off in early March and will conclude in November. UEC proposed the idea following a discussion between BPA and Northwest Requirements Utilities members regarding potential irrigation load solutions to oversupply challenges. In 2010, Southwest Irrigation District installed a pumping system to recharge an aquifer located west of Burley on United Electric Co-op’s system. The system pumps water from the Snake River through three pipelines, to injection wells and/or irrigation canals. Aquifer recharge occurs in two ways – either through direct pumping into the aquifer or by using the irrigation canals to avoid withdrawing water from the aquifer. The installed capacity of the pumping system on United Electric’s system is approximately 1.8 MW. Increasing loads during LLH has several potential benefits:
|
|||||||||||||||||||||||||||||||||||||||
|
Need help finding something? Send us a message, or give us a call at 800-622-4519. NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel. BPA Privacy Policy |