Sign In
BP-14 Initial Proposal
Document No. Studies and Documentation

Posted

BP-14-E-BPA-01 Power Rates Study ​11/14/12
​BP-14-E-BPA-01A Power Rates Study Documentation ​11/14/12
​BP-14-E-BPA-02 Power Revenue Requirement Study ​11/14/12
​BP-14-E-BPA-02A Power Revenue Requirement Study Documentation ​11/14/12
​BP-14-E-BPA-03 Power Loads and Resources Study ​11/14/12
​BP-14-E-BPA-03A Power Loads and Resources Study Documentation ​11/14/12
​BP-14-E-BPA-04 Power Risk and Market Price Study ​11/14/12
​BP-14-E-BPA-04A Power Risk and Market Price Study Documentation ​11/14/12
​BP-14-E-BPA-05 Generation Inputs Study ​11/14/12
​BP-14-E-BPA-05A-E01 Generation Inputs Study Documentation (Replaced in entirety; 11-16-2012*) ​11/16/12
​BP-14-E-BPA-06 Transmission Segmentation Study ​11/14/12
​BP-14-E-BPA-06A Transmission Segmentation Study Documentation ​11/14/12
​BP-14-E-BPA-07 Transmission Rates Study ​11/14/12
​BP-14-E-BPA-07A Transmission Rates Study Documentation ​11/14/12
​BP-14-E-BPA-08 Transmission Revenue Requirement Study ​11/14/12
​BP-14-E-BPA-08A Transmission Revenue Requirement Study Documentation ​11/14/12
​BP-14-E-BPA-09

20114 Power Rates Schedules and General Rate Schedule Provisions

(FY-2014-2015)

 

​11/14/12
​BP-14-E-BPA-10 Transmission, Ancillary and Control Area Service Rate Schedules ​11/14/12
*Due to a clerical error, an incorrect draft of BP-14-E-BPA-05A was uploaded to this website on November 14, 2012. BP-14-E-BPA-05A-E01 replaces the original document in entirety. BP-14-E-BPA-05A-E01 includes substantive changes on page 51, minor changes on pages 48 and 50, and spelling error corrections throughout the documentation.

​BP-14-BPA-11 -

BP-14-E-BPA-20

Consolidated Testimony (Power) - Volume 1 ​11/14/12
​BP-14-E-BPA-11 Power Rates Policy ​11/14/12
​BP-14-E-BPA-12 Loads and Resources ​11/14/12
​BP-14-E-BPA-13 Power Revenue Requirement Study ​11/14/12
​BP-14-E-BPA-14 Market Price Forecast ​11/14/12
​BP-14-E-BPA-15 Power Risk Assessment and Mitigation ​11/14/12
​BP-14-E-BPA-16

FY 2014-2015 Cost of Service Analysis and Rate Design

Changes and Adjustments

 

​11/14/12
​BP-14-E-BPA-17 Tier 2 and Resource Support Services Rates ​11/14/12
​BP-14-E-BPA-18 Slice True-up Adjustment Issues ​11/14/12
​BP-14-E-BPA-19

 Changes to Power Rate Schedules and General Rate Schedule​

Provisions (GRSPs)

 

​11/14/12
​BP-14-E-BPA-20 Transfer Service ​11/14/12
 

BP-14-E-BPA-21 -

BP-14-E-BPA-28

Consolidated Testimony (Generation Inputs) - Volume 2 ​11/14/12
​BP-14-E-BPA-21 Generation Inputs Policy ​11/14/12
​BP-14-E-BPA-22 Balancing Reserve Capcacity Quantify Forecast ​11/14/12
​BP-14-E-BPA-23

Provision of Balancing Reserve Capacity from the Federal

Columbia River Power System

 

​11/14/12
​BP-14-E-BPA-24 Balancing Reserve Capacity Cost Allocation Methodology ​11/14/12
​BP-14-E-BPA-25 ​Operating Reserves Cost Allocation ​11/14/12
​BP-14-E-BPA-26 Generation Inputs for Other Services ​11/14/12
​BP-14-E-BPA-27 Other Inter-Business Line Allocations ​11/14/12
​BP-14-E-BPA-28 Ancillary and Control Area Services Rate Design ​11/14/12
 

BP-14-E-BPA-29 -

BP-14-E-BPA-35

Consolidated Testimony (Transmission) - Volume 3 ​11/14/12
​BP-14-E-BPA-29 Segmentation ​11/14/12
​BP-14-E-BPA-30 Transmission Rates Study and Rate Design ​11/14/12
​BP-14-E-BPA-31 Transmission Revenue Requirement Study ​11/14/12
​BP-14-E-BPA-32 Transmission Risk Analysis ​11/14/12
​BP-14-E-BPA-33 Transmission Network Segment Cost Allocation ​11/14/12
​BP-14-E-BPA-34 ​Transmission Sales and Revenue Forecast ​11/14/12
​Bp-14-E-BPA-35 Montana Intertie ​11/14/12

​BP-14-Q-BPA-1 -

BP-14-Q-BPA-67

Consolidated Qualification Statements ​11/14/12
 
Stay Connected Related Sites