Bonneville Power Administration

http://www.bpa.gov

Link to BPA Home Page Skip Primary Navigation
Link to BPA Home Page
  BPA Home Triangle Bullet Point Rate Cases Triangle Bullet Point 2007 Triangle Bullet Point 2008 Transmission and Ancillary Services Rate Case


This is a spacer graphic
This is a spacer graphic Triangle bullet point Rate Case Overview

This is a spacer graphic Triangle bullet point BPA's Costs

This is a spacer graphic Triangle bullet point Before a Rate Case

This is a spacer graphic Triangle bullet point Rate Case Elements

This is a spacer graphic Triangle bullet point Step by Step

This is a spacer graphic Triangle bullet point FERC Review

This is a spacer graphic Triangle bullet point Upcoming/Current Rate Cases

This is a spacer graphic Triangle bullet point Rate Case Archive




Adjust your View!
 Link to USA.gov


2008 Transmission and Ancillary Services Rate Case




Background
On April 23, 2007, the Administrator of the Bonneville Power Administration (BPA) signed the Final Record of Decision (Final ROD) concluding the 2006 Transmission and Ancillary Services Rate Proposal that established BPA's transmission rates for FY 2008-2009.

The Final ROD also includes BPA's 2008 Transmission and Ancillary Services Rate Schedules.

BPA filed the Federal Register Notice for the 2008 Transmission rate proceeding on February 5, 2007.

Resources
The links on the right go to individual elements of the rate case.
table top
2008 Transmission Rate Case Resources
table bottom


If you believe information on this site is missing or in error, please Submit that comment here.
NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel. BPA Privacy Policy

     Page last modified on Thursday September 13, 2007.