BPA Power Services
 
http://www.bpa.gov/power/
 
Link to BPA Home Page Skip Primary Navigation
Power Services Home Page

Firstgov
 
Power Rates
December 18, 2003
LB CRAC Workshop
(updated January 22, 2004)
 

Workshop Materials/Handouts
  1. November 6, 2003 Letter (workshop announcement)
    (PDF, 1 page, 25 kb, posted December 1, 2003)
    [Note: The December 11th workshop originally announced in this letter was rescheduled to December 18th.  A second workshop was not necessary.]
     
  2. Agenda
    (PDF, 1 page, 6 kb, posted in the "Queue" on December 18, 2003, posted here on January 13, 2004)
     
  3. Update to Safety-Net CRAC Adjustment
    (PDF, 27 pages, 92 kb, posted in the "Queue" on December 18, 2003, posted here on January 13, 2004)
     
  4. Presentation Packet from Previous (August 28, 2003) FB/SN CRAC Workshop
    (PDF, 41 pages, 292 kb, posted November 18, 2003)
     
  5. Draft LB CRAC Results
    (PDF, 11 pages, 151 kb, posted in the "Queue" on December 18, 2003, posted here on January 13, 2004)
      - LB CRAC 6 Adjustment for April 2004 - September 2004
      - LB CRAC 4 True-Up for April 2003 - September 2003
      - Forecast of Future LB CRAC Percentages

     
Post-Workshop Materials
  1. Final LB CRAC Results (same as Draft LB CRAC Results above)
    (PDF, 11 pages, 153 kb, posted January 22, 2004)
      - LB CRAC 6 Adjustment for April 2004 - September 2004
      - LB CRAC 4 True-Up for April 2003 - September 2003
      - Forecast of Future LB CRAC Percentages

     
  2. December 30, 2003 Letter (announcement of final LB CRAC results)
    (PDF, 1 page, 24 kb, posted January 22, 2004)
     
  3. Corrected ToolKit Model Files
     
    Instructions for Downloading: Create an empty folder on a local drive. Click on the links below with your right mouse button and select "Save Target As" to download the desired file(s) to this folder. Be sure to download both input files (RM and TBL) and one or more ToolKit Model (TK) files to the same folder.
     
    Input Files from Previous (August 28, 2003) FB/SN CRAC Workshop
    (MS Excel, posted November 18, 2003)
      - RM_3rdQR_8-18-3-03_revised_8-20-03.xls (745 kb)
      - TBL_Resrv_Data_Full-Adv-Amort_rev_8-18-03.xls (345 kb)
      
    Corrected ToolKit Model Run Files
    (MS Excel, posted January, 22, 2004)
      - TK_196_Run-4f_TPPs-with-reduced-04-SNCRAC_11-Dec-03.xls (4.8 MB)
      - TK_196_Run-4f_TPPs-with-reduced-04-SNCRAC_NewLBs_16-Dec-03.xls (4.8 MB)
      - TK_196_Run-8f_Settlement_TPPs-with-04-SN-0%_11-Dec-03.xls (3.1 MB)
      - TK_196_Run-8f_Settlement_TPPs-with-04-SN-0%_NewLBs_16-Dec-03.xls (3.1 MB)
 

Archive of content originally posted or last updated on:  January 22, 2004.
Content originally provided by:  Michael Normandeau, BPA Power Business Line.
Content provided by:  Greg Gustafson, 503-230-5820, gcgustafson@bpa.gov.
Page maintained by:  BPA Web Team.
Skip to start of content.  Access Key = C
Skip to short cut links below
Skip to start of content.  Access Key = C If you believe information on this site is missing or in error, please Submit that comment here.
NOTICE: This server is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel.