​I-5 Corridor Reinforcement - Final EIS
​The final EIS includes refinements, corrections and updates to the draft EIS based on the comments and other input we received as well as from further study and analysis. 
 
Links to the final EIS are below. Useful information to have before reading the EIS is included in Notes to Reader. These notes are not a summary of the document; rather, they are intended to make the information in the EIS easier to find and understand. The notes also identify the key changes that have been made to the EIS between the draft and the final.
 
Below, you may click on specific files you wish to view. BPA’s response to comments received during the draft EIS comment period are included in Volume 3 (Volume 3A through 3H).
 
Files vary in size. Large files are split into several smaller ones, but some files are over 30 megabytes and may take a few minutes to load onto your screen.
​EIS
Volume 1 Volume 2
 
Volume 1 ​Front and back cover pages
​Volume 1 ​Inside cover page
Abstract
Notes To Reader
Perforated Icons
​Table of Contents
Summary
​Chapter  1 ​Purpose of and Need for Action
​Chapter  2 ​Facility Siting, Route Segments, and Action Alternatives
​Chapter  3 ​Project Components and Construction, Operation, and Maintenance Activities
Chapter  4 ​Proposed Action and Alternatives
Chapter  5 ​Land
Chapter  6 ​Recreation
Chapter  7 ​Visual Resources
Chapter  8 ​Electric and Magnetic Fields
Chapter  9 ​Noise
Chapter  10 ​Health and Safety
Chapter  11 ​Socioeconomics
​Chapter  12 ​Transportation

Chapter  13

​Cultural Resources

 

 

 

 

Volume 3

Volume 3A           Comment Report
Volume 3B           Comment Report
Volume 3C           Comment Report
Volume 3D           Comment Report
Volume 3E           Comment Report
Volume 3F           Comment Report
Volume 3G           Comment Report
Volume 3H           Comment Report

Volume 2 ​Front and back cover pages
Volume 2 ​Inside cover page
Table of Contents
Chapter  14 ​Geology and Soils
Chapter  15 ​Water
Chapter  16 ​Wetlands
Chapter  17 ​Vegetation
Chapter  18 ​Wildlife
Chapter  19 ​Fish
Chapter  20 ​Climate
Chapter  21 ​Air Quality
Chapter  22 ​Greenhouse Gases
Chapter  23 ​Intentional Destructive Acts
Chapter  24 ​Short-Term Uses versus Long-Term Productivity
Chapter  25 ​Irreversible or Irretrievable Commitment of Resources
Chapter  26 ​Cumulative Impacts
Chapter  27 ​Consultation, Review, and Permit Requirements
Chapter  28 ​Consistency with State Substantive Standards
Chapter  29 ​References
Chapter  30 ​List of Preparers
Chapter  31 ​Agencies, Organizations, and Persons Receiving this EIS
Chapter  32 ​Glossary and Acronyms
Chapter  33 ​Index
 
 
​​Appendices
​Appendix A, B, B1,
D, D1
Front and back cover pages
Appendix A, B, B1,
D, D1-F
​Inside cover page
Appendix A ​Washington Department of Natural
Resources Lands Analysis
Appendix B  ​Right-of-Way Tower Configuration Tables and Figures
Appendix B1 ​Right-of-Way Tower Configuration Tables and Figures Update
Appendix C Front and back cover pages
Appendix C Photomap Book pages 1-56
Appendix C Photomap Book pages 57-113
Appendix C Photomap Book pages 114-170
Appendix C Photomap Book pages 171-227
Appendix C Photomap Book pages 228-284
Appendix C Photomap Book pages 285-340

Appendix C1
Appendix C1
Appendix C1
Appendix C1
Appendix D

Front and back cover pages
Inside cover page
Photomaps pages 1-56
Photomaps pages 57-113I-5 Transmission Corridor Project Underground Route Study

Appendix D1

Appendix E
​I-5 Transmission Corridor Project Underground Route Study Update
Visual Resource Report in Support of the I-5 Corridor Reinforcement Project EIS
 
Appendix F Electrical Effects for the I-5 Corridor Reinforcement Project
Appendix F1
Electrical Effects Update
Appendix G Research on Extremely Low Frequency Electric and Magnetic Fields and Health
Appendix G1 ​Health Research Update
Appendix H ​Environmental Justice Tables
Appendix I ​Cultural Resource Sensitivity Scores
Appendix J ​Geologic Assessment – Geologic Hazards, Soil and Slope Gradient, Geology, Shallow Bedrock, Shallow Groundwater
Appendix K ​Assessment of Relative Fish Habitat and Fish Population Impacts
Appendix L ​GIS Wetland Modeling
Appendix M ​Noxious Weed Species List
Appendix N NEPA Disclosure Forms
Appendix O ​Shoreline Management Act and Critical Area Ordinance Consistency