Submit Comments
View Comments
 




Olympic Peninsula Reinforcement Project



The following comments were submitted in response to the open comment period described below.

Comments are numbered consecutively as they are received. Breaks in the number sequence result when comments are deleted because they were submitted in error or have inappropriate content (such as SPAM). If you do not see your comment two business days after you submit it, please contact (800) 622-4519.

The Bonneville Power Administration is proposing to upgrade an existing 20-mile, 115-kilovolt (kV) transmission line between BPA’s Olympia and Shelton substations on the Olympic Peninsula. On Feb. 15, 2008, BPA released a preliminary environmental assessment of the proposed project for review and comment. BPA is accepting comments through March 6, 2008.



For More Information:
http://www.efw.bpa.gov/environmental%5Fservices/Document%5FLibrary/Olympic/

Close of comment:  3/7/2008

  • OPR0001 -  Johnson/Thurston County Noxious Weed Control

  • OPR0002 -  Poague/Myself and spouse

  • OPR0003 -  /Kaufman

  • OPR0004 -  Holter/WA Dept. of Archaeology

  • OPR0005 -  Miller/Skokomish Tribe

  • OPR0006 -  Sheaffer

  • OPR0007 -  Albaugh/Gillis Auto Center

  • OPR0008 -  /Washington Department of Ecology

  • OPR0009 -  Duncan/Jamestown S'Klallam Tribe

  • OPR0010 -  Calls



If you believe information on this site is missing or in error, please Submit that comment here.
NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel.