Walla Walla Tucannon River Transmission Line Rebuild Project



The following comments were submitted in response to the open comment period described below.

Comments are numbered consecutively as they are received. Breaks in the number sequence result when comments are deleted because they were submitted in error or have inappropriate content (such as SPAM). If you do not see your comment two business days after you submit it, please contact (800) 622-4519.

BPA is proposing to rebuild the 47 mile long, Walla Walla -Tucannon River 115 kilovolt (kV) transmission line located in Walla Walla and Columbia counties, Washington.
The project would include replacing wood poles, associated structural components, and conductor, access road improvements, and some vegetation removal. The rebuild would enable BPA to maintain reliable electric service and avoid risks to the public and worker safety. The line would continue to operate at 115-kV.



For More Information:
http://www.efw.bpa.gov/environmental_services/Document_Library/Walla_Walla-Tucannon_River_Rebuild/

Close of comment:  4/18/2010

  • WWTR10000 -  Allen

  • WWTR10001 -  comment not for this project/Spligitty FOS

  • WWTR10002 -  Allen/Allen Family Ranch, Inc.

  • WWTR10003 -  Kimball/K Farms Inc.

  • WWTR10004 -  Nelson Jr.

  • WWTR10008 -  Shepherd/Sherpherd Farms, Inc.

  • WWTR10009 -  Walter