Sign In
​Maiden Wind Farm  (DOE/EIS-0333)
Benton and Yakima Counties, Washington

PROJECT DESCRIPTION:
Washington Winds Inc. proposes to build and operate a wind project of up to 494 MW north of Prosser. BPA proposes to acquire and transmit up to 50 average MW, but will study the full electrical output of the project. Benton County has not issued a conditional use permit for this project. BPA has not issued a Record of Decision for this project.

CONTACT:
For further information on this project, please contact ECAdmin@bpa.gov or 503-230-4628.

DOCUMENTS:
Public Letter                                                    (01/03/2003)
Abbreviated FEIS with links to comment letters      (01/03/2003)
Abbreviated FEIS including comment letters          (01/03/2003)

DRAFT EIS:
DEIS-0333 Summary        (03/29/2002)
Public Letter                    (03/26/2002)
Draft EIS (March 2002)
         Cover, Table of Contents, Acronyms, Glossary, Summary 
         Chapters 1 & 2 
         Chapter 3.1-5 
         Chapter 3.6-17 
         Chapters 4-6 
         Index, Appendix A, Public Involvement

SCOPING: 
Post Scoping Letter      (10/22/2001)
Scoping Letter             (06/11/2001)

NOTICE of INTENT
Notice of Intent (NOI)     (June 2001)

Please note that the Final EIS does not reproduce the whole Draft EIS -- Since the changes and corrections to the Draft EIS were relatively minor, we chose to just print the changes to the Draft. To get the full picture, both the abbreviated Final EIS and a copy of the Draft EIS are needed.