Sign In
‚ÄčTanner Electric Transmission Line
King County, Washington

PROJECT DESCRIPTION:
To build a 4.5 mile transmission line that would tie a new substation proposed by Tanner Electric Cooperative, into an existing transmission line (owned by Puget Sound Energy).

CONTACT:
For further information on this project, please contact Gene Lynard, BPA Environmental Lead.

DOCUMENTS:
Decision Letter             (09/14/2000)
Public Letter                 (08/18/2000)
Cover                          (08/22/2000)
FONSI                         (08/22/2000)
Final Environmental Assessment   (08/23/2000)
Figures 1-3 from FEA      (08/23/2000)
Figures 4-7 from FEA      (08/23/2000)
Figures 8-13 from FEA    (08/23/2000)
Photos from FEA            (08/23/2000)
Appendices A-C             (08/23/2000)
Public Letter                  (01/03/2000)
Map (part of public letter)  (01/03/2000)