FY 2012 FOIA Requests
Number
Request
Dates
Correspondence
2012-00009C
Topic: I-5 Reinforcement Project crossing Columbia River - Longview and Troutdale
Requester: Richard van Dijk
Comments: CLOSED. Consult.
Date Received: 10/11/2011
Date Due: 11/8/2011
Date Completed:11/15/2011
2012-00089
Topic: BPA's current energy/capacity contracts with Whatcom County and Chelan
Requester: Bethany Findley
Comments: CLOSED
Date Received: 10/14/2011
Date Due: 11/14/2011
Date Completed:10/24/2011
2012-00163C
Topic: I-5 Reinforcement Project documents
Requester: US Army Corps of Engineers
Comments: CLOSED. Consult.
Date Received: 1/20/2012
Date Due: 2/28/2012
Date Completed:3/5/2012
2012-00176
Topic: Check that paid for easement with City of Chehalis
Requester: Joyce Osborn
Comments: CLOSED
Date Received: 10/24/2011
Date Due: 11/22/2011
Date Completed:10/28/2011
2012-00180C
Topic: Budget spent on commemorative items
Requester: Department of Energy
Comments: CLOSED. Consult.
Date Received: 5/4/2011
Date Due: 5/18/2012
Date Completed:5/16/2012
2012-00183C
Topic: I-5 Reinforcement Project documents
Requester: US Army Corps of Engineers
Comments: CLOSED. Consult.
Date Received: 5/7/2012
Date Due: 6/5/2012
Date Completed:6/4/2012
2012-00185C
Topic: Personnel Action Forms (SF-50s) for FOIA personnel
Requester: Department of Energy
Comments: CLOSED. Consult.
Date Received: 5/17/2012
Date Due: 6/1/2012
Date Completed:5/18/2012
2012-00189C
Topic: I-5 Reinforcement Project documents
Requester: Department of Energy
Comments: CLOSED. Consult.
Date Received: 5/31/2012
Date Due: 6/28/2012
Date Completed:6/4/2012
2012-00194
Topic: Augsperger Mountain Radio Station Fiber Upgrade
Requester: Benjamin Johnson
Comments: CLOSED
Date Received: 10/21/2011
Date Due: 11/29/2011
Date Completed:1/19/2012
2012-00195
Topic: Contract with TerrAqua, Inc.
Requester: Patrick Moberg
Comments: CLOSED
Date Received: 10/27/2011
Date Due: 11/29/2011
Date Completed:2/17/2012
2012-00196C
Topic: Implementation of Job Family Standards for IT Program Manager position
Requester: Richard Warren
Comments: CLOSED. Consult.
Date Received: 6/15/2012
Date Due: 7/16/2012
Date Completed:6/27/2012
2012-00224C
Topic: Sulfur Creek 2010 Fisheries Report
Requester: Departement of the Interior
Comments: CLOSED. Consult.
Date Received: 8/13/2012
Date Due: 9/11/2012
Date Completed:8/29/2012
2012-00235
Topic: I-5 emails - Baskerville
Requester: Richard van Dijk
Comments: CLOSED
Date Received: 11/7/2011
Date Due: 12/7/2011
Date Completed:12/9/2011
2012-00236
Topic: I-5 emails - Klumpp
Requester: Richard van Dijk
Comments: CLOSED
Date Received: 11/7/2011
Date Due: 12/7/2011
Date Completed:2/1/2012
2012-00238
Topic: I-5 emails - Wittpenn
Requester: Richard van Dijk
Comments: CLOSED
Date Received: 11/7/2011
Date Due: 12/7/2011
Date Completed:1/27/2012
2012-00243
Topic: Albeni Falls Dam Flexible Winter Operations Environmental Assessment
Requester: Susan Drumheller
Comments: CLOSED
Date Received: 11/7/2011
Date Due: 12/7/2011
Date Completed:2/22/2012
2012-00294
Topic: I-5 public comments after October 2010
Requester: Richard van Dijk
Comments: CLOSED
Date Received: 11/17/2011
Date Due: 12/6/2011
Date Completed:12/5/2011
2012-00330
Topic: all documentation or materials submitted by Biomark
Requester: Daniel Minutillo
Comments: CLOSED
Date Received: 12/5/2011
Date Due: 1/3/2012
Date Completed:5/16/2012
2012-00364
Topic: Asotin wildlife area contracts, communications 2010 – 2011
Requester: Rob Kavanaugh
Comments: CLOSED
Date Received: 12/6/2011
Date Due: 1/5/2012
Date Completed:1/30/2012
2012-00399
Topic: amount paid to Tek–Systems for telecom tech position
Requester: Rodney Stevens
Comments: CLOSED
Date Received: 12/12/2011
Date Due: 1/11/2012
Date Completed:12/15/2011
2012-00412
Topic: Tek-Systems
Requester: Michael Rice
Comments: CLOSED
Date Received: 12/13/2011
Date Due: 1/12/2012
Date Completed:12/15/2011
2012-00476
Topic: I-5 Reinforcement Project Pearl substation
Requester: Richard van Dijk
Comments: CLOSED
Date Received: 12/29/2011
Date Due: 1/30/2012
Date Completed:3/8/2012
2012-00477
Topic: I-5 Reinforcement Project Troutdale substation
Requester: Richard van Dijk
Comments: CLOSED
Date Received: 12/29/2011
Date Due: 1/30/2012
Date Completed:3/8/2012
2012-00478
Topic: I-5 Reinforcement Project/Port of Portland purchase Troutdale land
Requester: Richard van Dijk
Comments: CLOSED
Date Received: 12/29/2011
Date Due: 1/30/2012
Date Completed:3/8/2012
2012-00479
Topic: I-5 Reinforcement Project - listening meeting agenda, notes, presentations
Requester: Richard van Dijk
Comments: CLOSED
Date Received: 12/29/2011
Date Due: 1/30/2012
Date Completed:3/8/2012
2012-00507
Topic: Montana 500 kv transmission
Requester: Kory Hofland
Comments: CLOSED
Date Received: 1/4/2012
Date Due: 2/2/2012
Date Completed:2/22/2012
2012-00551
Topic: I-5 Reinforcement Project e-mails, correspondence from or to Golder Associates
Requester: Terry Constance
Comments: CLOSED
Date Received: 1/11/2012
Date Due: 2/9/2012
Date Completed:5/31/2012
2012-00552
Topic: Supplemental labor posting for telecommunication support technician
Requester: Michael Weisberg
Comments: CLOSED
Date Received: 1/11/2012
Date Due: 2/9/2012
Date Completed:2/3/2012
2012-00624
Topic: Corona & Field Effects Version 3.0 (2011-00167-F)
Requester: Ryszard Bajda
Comments: CLOSED
Date Received: 1/23/2012
Date Due: 2/21/2012
Date Completed:1/26/2012
2012-00625
Topic: Amount paid to TEK-SYSTEMS for Network Technician Level 1
Requester: Rodney Stevens
Comments: CLOSED
Date Received: 1/26/2012
Date Due: 2/24/2012
Date Completed:2/2/2012
2012-00656
Topic: Corona & Field Effects Version 3.0
Requester: James Dauphinais
Comments: CLOSED
Date Received: 1/31/2012
Date Due: 2/29/2012
Date Completed:1/31/2012
2012-00659
Topic: PO or itemize payment amounts for six BPA catalog items from 2009 to 2011
Requester: James Engberg
Comments: CLOSED
Date Received: 1/31/2012
Date Due: 2/29/2012
Date Completed:2/17/2012
2012-00676
Topic: BPA Substation Design related to direct stroke lightning shielding of substations
Requester: Francisco Carvalho
Comments: CLOSED
Date Received: 2/1/2012
Date Due: 3/1/2012
Date Completed:2/2/2012
2012-00718
Topic: Latest Ciber contract
Requester: Janella Simpson
Comments: CLOSED. Withdrawn
Date Received: 2/8/2012
Date Due: 3/8/2012
Date Completed:3/7/2012
2012-00740
Topic: line item budget of BPA aviation dept, include contract pilots, aircraft
Requester: Robert Burns
Comments: CLOSED. Released in Full
Date Received: 2/10/2012
Date Due: 3/12/2012
Date Completed:2/23/2012
2012-00793
Topic: BPA boilerplate hydro power purchase agreement
Requester: George Clark
Comments: CLOSED
Date Received: 2/22/2012
Date Due: 3/21/2012
Date Completed:2/23/2012
2012-00805
Topic: Sole source justifications from 8-1-10 to 11-30-11
Requester: Danielle Ivory
Comments: CLOSED. Withdrawn DOE
Date Received: 2/24/2012
Date Due: 3/23/2012
Date Completed:3/5/2012
2012-00810
Topic: Use of Friends of the Columbia Gorge settlement agreement funds
Requester: Susan Drummond
Comments: CLOSED. No Responsive Records
Date Received: 2/27/2012
Date Due: 3/26/2012
Date Completed:2/27/2012
2012-00860
Topic: Hyundai Heavy Industries contract for 230kv tranformers
Requester: Scott Johnson
Comments: CLOSED
Date Received: 3/7/2012
Date Due: 4/4/2012
Date Completed:11/30/2012
2012-00862
Topic: HICO contract for 525kv tranformers
Requester: Scott Johnson
Comments: CLOSED
Date Received: 3/7/2012
Date Due: 4/4/2012
Date Completed:7/24/2012
2012-00940
Topic: Contract #28333 Release 19 Geotechnical Report
Requester: Peter Tapio
Comments: CLOSED
Date Received: 3/21/2012
Date Due: 4/18/2012
Date Completed:4/6/2012
2012-00941
Topic: Wilson Construction bid
Requester: Peter Tapio
Comments: CLOSED
Date Received: 3/21/2012
Date Due: 4/18/2012
Date Completed:6/21/2012
2012-00942
Topic: Contract #28333 Release 19 Inspection reports, photos, records
Requester: Peter Tapio
Comments: CLOSED
Date Received: 3/21/2012
Date Due: 4/18/2012
Date Completed:5/31/2012
2012-01025
Topic: Use of Friends of the Columbia Gorge settlement agreement funds
Requester: Susan Drummond
Comments: CLOSED. No Responsive Records
Date Received: 4/2/2012
Date Due: 5/1/2012
Date Completed:4/3/2012
2012-01066
Topic: Hydro Optimization Team meeting materials from 4/10 - 4/12
Requester: Douglas Albright
Comments: CLOSED. Fees
Date Received: 4/10/2012
Date Due: 5/8/2012
Date Completed:4/27/2012
2012-01119
Topic: Settlement agreesment with tribes related to Big Eddy-Knight Project
Requester: Joseph Sexton
Comments: CLOSED. No Responsive Records
Date Received: 4/20/2012
Date Due: 5/18/2012
Date Completed:4/23/2012
2012-01121
Topic: 2008 Traditional Cultural Property Monitoring in the Lower Reaches of the Nch'i-wa'na
Requester: Joseph Sexton
Comments: CLOSED
Date Received: 4/23/2012
Date Due: 5/20/2012
Date Completed:5/21/2012
2012-01135
Topic: Use of Friends of the Columbia Gorge settlement agreement funds
Requester: Susan Drummond
Comments: CLOSED. No Responsive Records
Date Received: 4/25/2012
Date Due: 5/23/2012
Date Completed:4/25/2012
2012-01172
Topic: list of all grants, contracts in contracting database
Requester: Peter Doran
Comments: CLOSED
Date Received: 5/1/2012
Date Due: 5/30/2012
Date Completed:5/14/2012
2012-01173
Topic: ARAMARK contract
Requester: Art Marshall
Comments: CLOSED
Date Received: 5/3/2012
Date Due: 6/15/2012
Date Completed:6/19/2012
2012-01258
Topic: Procedure for use of Friends of the Columbia Gorge settlement agreement funds
Requester: Susan Drummond
Comments: CLOSED
Date Received: 5/14/2012
Date Due: 6/27/2012
Date Completed:7/17/2012
2012-01311
Topic: Technology & Innovation Project #88 - Telemetry Demonstration Project
Requester: Greg Adams
Comments: CLOSED
Date Received: 5/15/2012
Date Due: 6/27/2012
Date Completed:7/29/2013
2012-01336
Topic: MOAs between BPA Power & Transmission and payments
Requester: Ryan Neale
Comments: CLOSED
Date Received: 5/15/2012
Date Due: 6/13/2012
Date Completed:6/23/2012
2012-01350
Topic: Documents on BPA property in Walton, OR; Suislaw Soil & Water Conservation District (SSWCD)
Requester: Mary Swartzlander
Comments: CLOSED
Date Received: 5/17/2012
Date Due: 6/29/2012
Date Completed:6/28/2012
2012-01355
Topic: Documents on BPA property in Washington County, OR
Requester: Christina Kim
Comments: CLOSED
Date Received: 5/18/2012
Date Due: 7/2/2012
Date Completed:8/22/2012
2012-01387
Topic: phone records
Requester: John Qualls
Comments: CLOSED. Released in Full
Date Received: 5/23/2012
Date Due: 6/27/2012
Date Completed:6/27/2012
2012-01411
Topic: Use of Friends of the Columbia Gorge settlement agreement funds
Requester: Susan Drummond
Comments: CLOSED. No Responsive Records
Date Received: 5/29/2012
Date Due: 6/26/2012
Date Completed:5/30/2012
2012-01412
Topic: Documents re: change from Rock grouted footings to Plate footings
Requester: Peter Tapio
Comments: CLOSED. Released in Full
Date Received: 5/29/2012
Date Due: 7/12/2012
Date Completed:7/5/2012
2012-01416
Topic: Documents re: change from Drilled Pier foundation to Grillage
Requester: Peter Tapio
Comments: CLOSED. Released in Full
Date Received: 5/30/2012
Date Due: 7/13/2012
Date Completed:7/5/2012
2012-01466
Topic: All documents related to the projects for Contracts 32501 & 20546
Requester: David Shaw
Comments: CLOSED
Date Received: 6/13/2012
Date Due: 7/12/2012
Date Completed:8/7/2012
2012-01592
Topic: All records related to the North Steens 230 Kv line project.
Requester: Laird Lucas
Comments: CLOSED
Date Received: 7/5/2012
Date Due: 5/2/2016
Date Completed:4/11/2016
2012-01616
Topic: Use of Friends of the Columbia Gorge settlement agreement funds
Requester: Susan Drummond
Comments: CLOSED. No Responsive Records
Date Received: 7/5/2012
Date Due: 8/2/2012
Date Completed:7/27/2012
2012-01617
Topic: Washington2Advocates contracts,communications, invoices & work product
Requester: Dan Seligman
Comments: CLOSED
Date Received: 7/11/2012
Date Due: 8/8/2012
Date Completed:8/3/2012
2012-01627
Topic: email from him requesting phone records from Kassandra Brown
Requester: John Qualls
Comments: CLOSED. Released in Full
Date Received: 7/12/2012
Date Due: 8/9/2012
Date Completed:7/17/2012
2012-01628
Topic: communications with Congress re: Sec. Chu 3-16-12 memo to PMAs
Requester: Dan Seligman
Comments: CLOSED
Date Received: 7/13/2012
Date Due: 8/10/2012
Date Completed:8/1/2012
2012-01631
Topic: EMTP source code and Rule Book
Requester: Tanuj Khandelwal
Comments: CLOSED. Released in Full
Date Received: 7/14/2012
Date Due: 8/13/2012
Date Completed:7/20/2012
2012-01658
Topic: list of all sole source contracts in contracting database
Requester: Dan Seligman
Comments: CLOSED. Withdrawn
Date Received: 7/19/2012
Date Due: 8/16/2012
Date Completed:
2012-01683
Topic: contracting database pull of all personal services/consultant contracts over $100,000
Requester: Dan Seligman
Comments: CLOSED. Released in Full
Date Received: 7/30/2012
Date Due: 8/27/2012
Date Completed:8/16/2012
2012-01695
Topic: Recorded easements of private landowners along Big-Eddy/Knight transmission line
Requester: Robert Zornes
Comments: CLOSED. Withdrawn
Date Received: 7/30/2012
Date Due: 8/27/2012
Date Completed:
2012-01700
Topic: Agreements/docs for USEC, Energy NW, BPA, TVA, & DOE
Requester: Dan Seligman
Comments: CLOSED. Released in Full
Date Received: 8/1/2012
Date Due: 8/29/2012
Date Completed:10/4/2012
2012-01715
Topic: Recorded easements of private landowners along Big-Eddy/Knight transmission line
Requester: Robert Zornes
Comments: CLOSED. Released in Full
Date Received: 8/6/2012
Date Due: 9/4/2012
Date Completed:8/8/2012
2012-01716
Topic: Record of condemnation/eminent domain proceeds since January 2000
Requester: William Baude
Comments: CLOSED. Released in Full
Date Received: 8/3/2012
Date Due: 8/31/2012
Date Completed:8/14/2012
2012-01752
Topic: structural drawings of new double circuit and single circuit towers
Requester: Russel Balvin
Comments: CLOSED. Released in Full
Date Received: 8/14/2012
Date Due: 9/12/2012
Date Completed:8/21/2012
2012-01776
Topic: LDD customer information
Requester: Benjamin Nivison
Comments: CLOSED. Fees
Date Received: 8/17/2012
Date Due: 9/17/2012
Date Completed:9/13/2012
2012-01784
Topic: All documents related to property
Requester: Robert Zornes
Comments: CLOSED. Released in Full
Date Received: 8/13/2012
Date Due: 9/11/2012
Date Completed:8/27/2012
2012-01801
Topic: Use of Friends of the Columbia Gorge settlement agreement funds
Requester: Susan Drummond
Comments: CLOSED. No Responsive Records
Date Received: 8/24/2012
Date Due: 9/24/2012
Date Completed:9/25/2012
2012-01802
Topic: All travel records for employee travel paid by private parties
Requester: Jennifer Peebles
Comments: CLOSED. Duplicate
Date Received: 8/27/2012
Date Due: 9/25/2012
Date Completed:9/10/2012
2012-01815
Topic: All documents for I-5 Corridor Reinforcement Project meeting on 5/31/12 at the Corps of Engineers
Requester: Cheryl Brantley
Comments: CLOSED. Released in Full
Date Received: 8/29/2012
Date Due: 9/27/2012
Date Completed:9/20/2012
2012-01829
Topic: EMTP Primer, Field Test Comparisons, Application Guide, Source Code documentation
Requester: Tanuj Khandelwal
Comments: CLOSED. Released in Full
Date Received: 9/4/2012
Date Due: 10/2/2012
Date Completed:10/4/2012
2012-01842
Topic: May 1995 letter from ID state rep Helen Chenoweth re: Dworshak Dam mitigation
Requester: Tabitha Erdey
Comments: CLOSED. No Responsive Records
Date Received: 9/5/2012
Date Due: 10/3/2012
Date Completed:9/27/2012
2012-01868
Topic: Locations of GIC monitoring devices installed, data from those devices
Requester: Thomas Popik
Comments: CLOSED. Released in Full
Date Received: 9/7/2012
Date Due: 10/5/2012
Date Completed:10/19/2012
2012-01869
Topic: GS-9 or higher series 0193 on staff. Masters vs. Phd
Requester: Ameila Clark
Comments: CLOSED
Date Received: 9/10/2012
Date Due: 10/9/2012
Date Completed:9/25/2012
2012-01870
Topic: RFO #935. Invoices against contract #36191
Requester: Dan Seligman
Comments: CLOSED. Released in Full
Date Received: 9/10/2012
Date Due: 10/23/2012
Date Completed:11/6/2012
2012-01879
Topic: Contracts for legal services concerning FERC-excluding prices
Requester: Dan Seligman
Comments: CLOSED. Released in Full
Date Received: 9/12/2012
Date Due: 10/25/2012
Date Completed:12/13/2013
2012-01880
Topic: All docs regarding RTO West/Grid West from 1999-2005
Requester: Jacob Shwartz
Comments: CLOSED. Withdrawn
Date Received: 9/12/2012
Date Due: 10/11/2012
Date Completed:
2012-01885
Topic: All communications between BPA and FERC since 12/7/2011 concerning Docket EL11-44
Requester: Dan Seligman
Comments: CLOSED. No Responsive Records
Date Received: 9/12/2012
Date Due: 10/11/2012
Date Completed:9/27/2012
2012-01927
Topic: Administrator's calendar 9-1-11 to 8-31-12
Requester: Dan Seligman
Comments: CLOSED
Date Received: 9/20/2012
Date Due: 10/19/2012
Date Completed:10/24/2012
2012-01928
Topic: Documents given to FERC Chairman from 1/2012 to present
Requester: Dan Seligman
Comments: CLOSED. Released in Full
Date Received: 9/17/2012
Date Due: 10/16/2012
Date Completed:10/16/2012
2012-01929
Topic: Documents support BPA submission to WA DNR application #51-087560
Requester: Robert Zornes
Comments: CLOSED. Withdrawn
Date Received: 9/17/2012
Date Due: 10/16/2012
Date Completed:
2012-01948
Topic: Corona & Field Effect/Advanced Tower Analysis & Design Software
Requester: Albert Tharnish
Comments: CLOSED. Released in Full
Date Received: 9/26/2012
Date Due: 10/25/2012
Date Completed:10/4/2012