Navigate Up
Sign In
Notice: Final  Notice of 2019 Cluster Study

​Posted Date: 8/31/2018

Bonneville Power Administration Transmission Services (BPAT) is providing final notice of its decision to perform a Cluster Study of certain transmission service requests (TSRs) over the Network portion of the Federal Columbia River Transmission System.