‚ÄčAlbeni Falls-Sand Creek Transmission Line Project
A section of the Albeni Falls-Sand Creek transmission line needed pole replacements and other upgrades to improve the reliability of the line.
BPA replaced about 340 wood poles along about 25 miles of the existing transmission line. Most of the activities took place on existing right-of-way from the Albeni Falls Dam to one mile north of BPA's Sandpoint Substation.