‚ÄčAlvey-Fairview No.1, 230 kV Rebuild
The Bonneville Power Administration is planning to rebuild the Alvey Fairview No. 1, 230kV transmission line, construction is scheduled for 2013 or 2014. The 97.46 mile transmission line transects Lane, Douglas and Coos Counties, OR. The project includes replacing all wood poles, cross arms, cross braces, guys, anchors, insulator assemblies, and line switches if required. The intention of the project is to rebuild the line while maintaining the same structure locations and similar pole heights as the existing line. An environmental assessment will be conducted to analyze the impacts of this project and identify appropriate mitigations measures. The public comment period for the scoping for the environmental assessment closed on December 28, 2011.
 
For more project information, visit: www.bpa.gov/go/alveyfairviewrebuild.