BPA is hosting a collaborative discussion with generators concerning how to make the New Generation Technology Pilot maximally beneficial for the region, generators and BPA. BPA will first discuss the general structure of the preliminary pilot design before opening the discussion for generators to bring their own ideas to the table for discussion and potential inclusion in the pilot. The pilot is to be a means for generators to lower their need for balancing capacity from the BPA BA thereby lowering their VERBS/DERBS rate and lowering the amount of balancing reserve capacity BPA needs to hold.

Webex webinar link: https://bpa.webex.com/bpa/j.php?MTID=m82425624643feb329d38b8137d684f4c

Webinar number: 2830 250 6983

Webinar password: DvPaJ2paK83 (38725272 when dialing from a video system)

 

Tags

Related News and Events

GERP 1.0 & 2.0 Update

BPA will provide an update on projects included in the GERP 1.0 & 2.0 portfolios.

Generator Interconnection Cluster Study Report Meeting - Day 1

From Feb. 9 to 12, BPA will host a series Cluster Study Report Meetings as outlined in section 6.6 (b) of Attachment L. While these meetings are open to the public, the purpose is to discuss the study results with Interconnection Customers and provide them with an opportunity to ask questions.