East Fork Irrigation District Modernization Project (DOE/EA - 2118)
Hood River County, Oregon
PROJECT DESCRIPTION:
The Bonneville Power Administration (BPA) proposes to fund the Eastside Lateral Piping Project, a discrete component of the East Fork Irrigation District Modernization Project. The Eastside Lateral Piping Project would modernize approximately six miles of irrigation infrastructure and is expected to cost up to $10 million to implement. BPA would provide the Confederated Tribes of the Warm Springs Reservation of Oregon with up to $1 million to fund certain design work and materials for the Eastside Lateral Piping Project.
 
ENVIRONMENTAL REVIEW:
As the lead agency, the Natural Resources Conservation Service (NRCS) prepared a Watershed Plan-Environmental Assessment (Plan-EA) following the procedures of the National Environmental Policy Act (NEPA) to understand the potential environmental impacts of the action.  BPA is a cooperating agency. The Plan-EA analyzed the East Fork Irrigation District Modernization Project, which includes providing funding for the Eastside Lateral Piping Project, as well as a no-action alternative in which BPA would not fund East Fork Lateral Pipeline upgrades and old infrastructure would remain in use and not upgraded. The Plan-EA described anticipated impacts to natural and human resources and identifies mitigation measures to help avoid or minimize impacts. During the NEPA process, NRCS and BPA are working with landowners; tribes; Federal, state, and local agencies; and interest groups.
 
The proposed schedule for the environmental review is as follows:
 
Scoping Comment Period​​ ​October 3, 2018 - November 16, 2018
Scoping Public Meeting​​ ​October 18, 2018 in Hood River, OR
Draft EA Comment Period​​ ​January 8 2020 - February 13, 2020
​Draft EA Public Meeting ​January 28, 2020 in Hood River, OR
Final Plan EA​​ ​Summer 2020
​Finding of No Significant Impact (if warranted) ​Summer 2020
If decision to build, construction start​ ​Fall 2020
 
CONTACT:
For environmental information, contact:
Israel Duran
Toll-free: 800-622-4519
Environmental Protection Specialist
Direct line: 503-230-3967
Salient CRGT
Bonneville Power Administration – ECF-4
 
PO Box 3621
 
Portland, Oregon 97208-3621
 
 
Chad Hamel
Toll-free: 800-622-4519
Fish and Wildlife Project Manager
Direct line: 503-230-5564
Bonneville Power Administration – ECF-4
PO Box 3621
 
Portland, Oregon 97208-3621
 
 
For project information, contact: 
Eric Andersen
Toll-free: 800-622-4519
Fish and Wildlife Administrator
Direct line: 503-230-4094
Bonneville Power Administration – EWL-4
PO Box 3621
 
Portland, Oregon 97208-3621
 
 
 
DOCUMENTS
DRAFT:
Public Letter        01/08/2020
Draft Plan-EA       01/08/2020

SCOPING:
Public Letter       10/03/2018
Project Map        10/18/2018